{"id":886,"date":"2025-03-19T11:03:26","date_gmt":"2025-03-19T03:03:26","guid":{"rendered":"https:\/\/www.cnkelaiii.com\/?p=886"},"modified":"2025-07-05T21:34:37","modified_gmt":"2025-07-05T13:34:37","slug":"how-precast-concrete-panels-are-fixed","status":"publish","type":"post","link":"https:\/\/www.cnkelaiii.com\/fr\/blog\/how-precast-concrete-panels-are-fixed\/","title":{"rendered":"Comment les panneaux en b\u00e9ton pr\u00e9fabriqu\u00e9 sont-ils fix\u00e9s ?"},"content":{"rendered":"<h2 class=\"x-el x-el-h3 c2-1 c2-2 c2-j c2-k c2-2q c2-1y c2-1w c2-1v c2-2r c2-2s c2-o c2-2t c2-q c2-2u c2-2v c2-2w c2-2x\" role=\"heading\" aria-level=\"3\" data-ux=\"BlogMainHeading\" data-typography=\"HeadingGamma\">Concrete partition wall panel installation guide-Precast concrete wall panel fixing<\/h2>\n<p><span style=\"color: #ff00ff; font-size: 19px;\">Precast concrete wall panel fixing usually requires the assistance of <a href=\"https:\/\/www.cnkelaiii.com\/fr\/wall-panel-installaiton-machines\/\" target=\"_blank\" rel=\"noopener\"><strong>hydraulic wall panel installation machine<\/strong><\/a>, which can improve construction efficiency.<\/span><\/p>\n<p>This is how to install the partition wall panel correctly. Installing precast partition wall panels is six times faster than traditional methods. These methods include brickwork or laying block walls. How are precast concrete wall panels fixed? This guide helps you quickly install <a href=\"http:\/\/www.kelaiii.com\/\" target=\"_blank\" rel=\"noopener\">prefabricated wall panels.<\/a><\/p>\n<figure id=\"attachment_6309\" aria-describedby=\"caption-attachment-6309\" style=\"width: 1024px\" class=\"wp-caption alignnone\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-large wp-image-6309\" src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/Concrete-Partition-Wall-Panel-Installation-Guide-1024x503.webp\" alt=\"Guide d&#039;installation des panneaux de cloison en b\u00e9ton\" width=\"1024\" height=\"503\" \/><figcaption id=\"caption-attachment-6309\" class=\"wp-caption-text\"><span style=\"color: #ff0000;\"><em>Guide d'installation des panneaux de cloison en b\u00e9ton<\/em><\/span><\/figcaption><\/figure>\n<p><span style=\"font-size: 19px;\">1. During stocking and transportation time it is possible to put only two stacks on top of each other. Stock yard should be level and panels should be protected against rain during stocking.<\/span><\/p>\n<p><span style=\"font-size: 19px;\">2.Panel stacks should always be lifted from under wooden pallet with a lifting fork or belt. Next, please refer to the concrete partition wall panel <a href=\"http:\/\/www.cnkelaiii.com\/fr\/\" target=\"_blank\" rel=\"noopener\">installation guide<\/a>.<\/span><\/p>\n<hr \/>\n<p><img decoding=\"async\" class=\"size-large wp-image-6313 lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/002_\u526f\u672c_\u526f\u672c-1024x509.webp\" alt=\"Guide d&#039;installation des panneaux de cloison en b\u00e9ton\" width=\"1024\" height=\"509\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/509;\" \/><\/p>\n<p><span style=\"font-size: 19px;\">3. The Wall panel stacks can easily be moved at construction site by a forklift or a trolley.<\/span><\/p>\n<p><span style=\"font-size: 19px;\">4. Single Wall panel can easily be moved by a simple wheel.<\/span><\/p>\n<hr \/>\n<p><img decoding=\"async\" class=\"alignnone wp-image-6314 size-large lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/003_\u526f\u672c_\u526f\u672c-1024x504.webp\" alt=\"Guide d&#039;installation des panneaux de cloison en b\u00e9ton\" width=\"1024\" height=\"504\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/504;\" \/><\/p>\n<p><span style=\"font-size: 19px;\">5. wall Panels can also be moved manually by inserting short steel tube (500 mm) into the second hollow as handle. Panels should always be transported sideways.<\/span><\/p>\n<p><span style=\"font-size: 19px;\">6 .Gluing agents should be mixed carefully.<\/span><\/p>\n<hr \/>\n<p><img decoding=\"async\" class=\"wp-image-6315 size-large alignnone lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/Concrete-Partition-Wall-Panel-Installation-Guide-2-1024x513.webp\" alt=\"Guide d&#039;installation des panneaux de cloison en b\u00e9ton\" width=\"1024\" height=\"513\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/513;\" \/><\/p>\n<p><span style=\"font-size: 19px;\">7.The line of wall is marked to the floor and ceiling before start of installation.<\/span><\/p>\n<p><span style=\"font-size: 19px;\">8.Guiding boards are fixed to the floor and ceiling. The guiding support will automatically align the wall when lifting the panels straight into upright position.<\/span><\/p>\n<hr \/>\n<figure id=\"attachment_6316\" aria-describedby=\"caption-attachment-6316\" style=\"width: 1024px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"wp-image-6316 size-large lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/Concrete-Partition-Wall-Panel-Installation-Guide-3-1024x512.webp\" alt=\"Precast concrete wall panel fixing\" width=\"1024\" height=\"512\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/512;\" \/><figcaption id=\"caption-attachment-6316\" class=\"wp-caption-text\">Precast concrete wall panel fixing<\/figcaption><\/figure>\n<p><span style=\"font-size: 19px;\">9.The gluing agent is spread on the side of the already installed Walls.<\/span><\/p>\n<p><span style=\"font-size: 19px;\">10.Before the Wall panel is lifted to upright position it should be moved so that the panel bottom is as close as possible to its correct position. After that the wall panel is lifted to upright position by two men.<\/span><\/p>\n<hr \/>\n<figure id=\"attachment_6317\" aria-describedby=\"caption-attachment-6317\" style=\"width: 1024px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-large wp-image-6317 lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/Concrete-Partition-Wall-Panel-Installation-Guide-5-1024x501.webp\" alt=\"Guide d&#039;installation des panneaux de cloison en b\u00e9ton \" width=\"1024\" height=\"501\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/501;\" \/><figcaption id=\"caption-attachment-6317\" class=\"wp-caption-text\">Guide d'installation des panneaux de cloison en b\u00e9ton<\/figcaption><\/figure>\n<p><span style=\"font-size: 19px;\">11.The walls should be pushed against the previous walls (and moved up and down) so that tongue and groove are carefully positioned against each other and gluing agent is squeezing out. Correct thickness of joint between two panels is 1-2 mm.<\/span><\/p>\n<p><span style=\"font-size: 19px;\">12 Wall panel is positioned to correct level by using wooden wedges at the bottom and top of the walls. The height of wall panels should be about10 &#8211; 50 mm smaller than free room height.<\/span><\/p>\n<hr \/>\n<figure id=\"attachment_6318\" aria-describedby=\"caption-attachment-6318\" style=\"width: 1024px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-large wp-image-6318 lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/This-is-how-to-install-the-partition-wall-panel-correctly-1024x499.webp\" alt=\"This is how to install the partition wall panel correctly\" width=\"1024\" height=\"499\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/499;\" \/><figcaption id=\"caption-attachment-6318\" class=\"wp-caption-text\">This is how to install the partition wall panel correctly\uff1f<\/figcaption><\/figure>\n<p><span style=\"font-size: 19px;\">13A.The top joint is filled with polyure than foam. Correct thickness of the joint is 5 &#8211; 10 mm.<\/span><\/p>\n<p><span style=\"font-size: 19px;\">14B.Alternatively, when same gluing agent as in sides is used for top joint , wall panel is pushed against ceiling so that gluing agent is squeezing out. Correct thickness of joint is 1-2 mm.<\/span><\/p>\n<hr \/>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-6319 size-large lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/008_\u526f\u672c-1024x505.webp\" alt=\"Guide d&#039;installation des panneaux de cloison en b\u00e9ton\" width=\"1024\" height=\"505\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/505;\" \/><\/p>\n<p><span style=\"font-size: 19px;\">14.The surplus gluing agent is removed from joints right after installation.<\/span><\/p>\n<p><span style=\"font-size: 19px;\">15.Bottom joint of wall panels is filled with mortar or concrete. Correct thickness of joint is 10 &#8211; 40 mm.<\/span><\/p>\n<hr \/>\n<p><img decoding=\"async\" class=\"size-large wp-image-6320 lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/wall-installation-1024x517.webp\" alt=\"Guide d&#039;installation des panneaux de cloison en b\u00e9ton\" width=\"1024\" height=\"517\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/517;\" \/><\/p>\n<p><span style=\"font-size: 19px;\">16 To the panels next to the door &#8216;shoulders&#8217; are sawed or flat steel bar for door top piece fixed. The door top piece is glued by using polyurethan foam or gluing agents. Joints should be as thin as possible. <\/span><\/p>\n<p><span style=\"font-size: 19px;\">17.All corners should be strengthened with nail plugs (3\/corner) for example HILTI HRD-H. We have the wall corner installation solution by T shape wall panel extruder and L shape wall panel extruder.<\/span><\/p>\n<hr \/>\n<p><img decoding=\"async\" class=\"alignnone wp-image-6321 size-large lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/wall-1024x506.webp\" alt=\"Concrete Partition Wall Panel Installation\" width=\"1024\" height=\"506\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/506;\" \/><\/p>\n<p><span style=\"font-size: 19px;\">18.On to corner joints paper or class fiber tape should be glued before plastering .<\/span><\/p>\n<p><span style=\"font-size: 19px;\">19.On to the joints at a door top piece paper or class fibre tape should also be glued before plastering.<\/span><\/p>\n<hr \/>\n<p><img decoding=\"async\" class=\"size-large wp-image-6322 lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/011_\u526f\u672c-1024x504.webp\" alt=\"Concrete Partition Wall Panel Installation\" width=\"1024\" height=\"504\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/504;\" \/><\/p>\n<p><span style=\"font-size: 19px;\">20.Flexible joints between wall panels should be built after each 5 &#8211; 6 m. PU-foam or mineral wool can be used as elastic joint material.<\/span><\/p>\n<p><span style=\"font-size: 19px;\">21.The hollow cores are used for leading through the cables and electrical boxes are drilled to any desired point.<\/span><\/p>\n<hr \/>\n<figure id=\"attachment_6323\" aria-describedby=\"caption-attachment-6323\" style=\"width: 1024px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"wp-image-6323 size-large lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/012_\u526f\u672c-1024x505.webp\" alt=\"Precast concrete wall panel fixing\" width=\"1024\" height=\"505\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/505;\" \/><figcaption id=\"caption-attachment-6323\" class=\"wp-caption-text\">Concrete Partition Wall Panel Installation<\/figcaption><\/figure>\n<p><span style=\"font-size: 19px;\">22. Wall panel needs only a very thin skim coating (1 &#8211; 2 mm) before surface finishing. It is easiest to do with a wide trowel.<\/span><\/p>\n<p><span style=\"font-size: 19px;\">23.All kinds of sawings and drilling are easy to make to the wall panels.<\/span><\/p>\n<hr \/>\n<figure id=\"attachment_6324\" aria-describedby=\"caption-attachment-6324\" style=\"width: 1024px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-large wp-image-6324 lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/03\/013_\u526f\u672c-1024x512.webp\" alt=\"Concrete Partition Wall Panel Installation\" width=\"1024\" height=\"512\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/512;\" \/><figcaption id=\"caption-attachment-6324\" class=\"wp-caption-text\">Concrete Partition Wall Panel Installation<\/figcaption><\/figure>\n<p><span style=\"font-size: 19px;\">24A .installation materials and accessories Mortar, cementitious adhessive, lumber, nail plugs, wooden wedges, paper tape, PU-foam and mortar mixer.<\/span><\/p>\n<p><span style=\"font-size: 19px;\">24B Installation tools Hammer, saw, screw driver, level, meter rule, trowel, drill, trolley, concrete cutter, installation steel bar, drill for electrical boxes, buckets and lifting bars.<\/span><\/p>\n<hr \/>\n<p><span style=\"color: #ff6600; font-size: 18px;\"><strong><span style=\"font-size: 20px; color: #0000ff;\"><span style=\"color: #ff99cc;\">precast concrete wall panel fixing use <\/span><\/span>Hydraulic wall panel installation machine can help you complete the wall panel construction work, saving time and effort, usually used in construction sites, fence construction, boundary wall construction and other places.<\/strong><\/span><\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-5776 size-full lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2025\/01\/hydraulic-wall-panel-installation-machine.png\" alt=\"precast concrete wall panel fixing Guide\" width=\"490\" height=\"540\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 490px; --smush-placeholder-aspect-ratio: 490\/540;\" \/><\/p>\n<h4><span style=\"color: #ff6600; font-size: 18px;\"><strong>Machine hydraulique pour l'installation de panneaux muraux<\/strong><\/span><\/h4>\n<blockquote class=\"wp-embedded-content\" data-secret=\"vPuLpc3pP6\"><p><a href=\"https:\/\/www.kelaiii.com\/hydraulic-wall-panel-lifting-machine\/\" target=\"_blank\" rel=\"noopener\">Machine hydraulique de pose de panneaux muraux<\/a><\/p><\/blockquote>\n<p><iframe class=\"wp-embedded-content lazyload\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"\u201cMachine hydraulique pour la pose de panneaux muraux\u201d - Henan Kelai Industrial Co.,ltd\" data-src=\"https:\/\/www.kelaiii.com\/hydraulic-wall-panel-lifting-machine\/embed\/#?secret=4qNZusJ3fY#?secret=vPuLpc3pP6\" data-secret=\"vPuLpc3pP6\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" data-load-mode=\"1\"><\/iframe><\/p>\n<hr \/>\n<p><a href=\"https:\/\/www.kelaiii.com\/precast-concrete-wall-panel-extruder\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"size-full wp-image-5118 lazyload\" data-src=\"http:\/\/www.kelaiii.com\/wp-content\/uploads\/2024\/12\/Double-Row-Hollow-Precast-Concrete-Wall-Panel-Machinery.jpg\" alt=\"Double Row Hollow Precast Concrete Wall Panel Machinery\" width=\"400\" height=\"400\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 400px; --smush-placeholder-aspect-ratio: 400\/400;\" \/><\/a><\/p>\n<blockquote class=\"wp-embedded-content\" data-secret=\"Tbb1YWsprI\"><p><a href=\"https:\/\/www.kelaiii.com\/precast-concrete-wall-panel-extruder\/\" target=\"_blank\" rel=\"noopener\">Extrudeuse de panneaux muraux en b\u00e9ton pr\u00e9fabriqu\u00e9<\/a><\/p><\/blockquote>\n<p><iframe class=\"wp-embedded-content lazyload\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"\u201cExtrudeuse de panneaux muraux en b\u00e9ton pr\u00e9fabriqu\u00e9 - Henan Kelai Industrial Co.\" data-src=\"https:\/\/www.kelaiii.com\/precast-concrete-wall-panel-extruder\/embed\/#?secret=QX4BEpnX0d#?secret=Tbb1YWsprI\" data-secret=\"Tbb1YWsprI\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" data-load-mode=\"1\"><\/iframe><\/p>\n<hr \/>\n<p><span style=\"font-size: 20px; color: #0000ff;\"><span style=\"color: #000000;\">By reading this article, you can know how the<\/span><span style=\"color: #ff99cc;\"> precast concrete wall panel fixing <\/span><span style=\"color: #000000;\">is operated, but do you know how the <\/span><\/span><span style=\"font-size: 20px; color: #ff6600;\"><strong>precast lightweight concrete wall panel<\/strong><\/span><span style=\"font-size: 20px; color: #0000ff;\"><span style=\"color: #000000;\"> is made by the precast concrete wall panel machine? Please pay attention to our website, you will learn more about the<\/span> <span style=\"color: #ff6600;\"><strong>machine \u00e0 panneaux de b\u00e9ton pr\u00e9fabriqu\u00e9s<\/strong><\/span>!<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>Concrete partition wall panel installation guide-Precast concrete wall panel fixing Precast concrete wall panel fixing usually requires the assistance of hydraulic wall panel installation machine, which can improve construction efficiency. This is how to install the partition wall panel correctly. Installing precast partition wall panels is six times faster than traditional methods. These methods include [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":887,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-886","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/www.cnkelaiii.com\/fr\/wp-json\/wp\/v2\/posts\/886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cnkelaiii.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cnkelaiii.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cnkelaiii.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cnkelaiii.com\/fr\/wp-json\/wp\/v2\/comments?post=886"}],"version-history":[{"count":0,"href":"https:\/\/www.cnkelaiii.com\/fr\/wp-json\/wp\/v2\/posts\/886\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cnkelaiii.com\/fr\/wp-json\/wp\/v2\/media\/887"}],"wp:attachment":[{"href":"https:\/\/www.cnkelaiii.com\/fr\/wp-json\/wp\/v2\/media?parent=886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cnkelaiii.com\/fr\/wp-json\/wp\/v2\/categories?post=886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cnkelaiii.com\/fr\/wp-json\/wp\/v2\/tags?post=886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}