Insights & Innovations in Precast Concrete Machinery

Facebook
Twitter
LinkedIn

Concrete partition wall panel installation guide-Precast concrete wall panel fixing

Precast concrete wall panel fixing usually requires the assistance of hydraulic wall panel installation machine, which can improve construction efficiency.

This is how to install the partition wall panel correctly. Installing precast partition wall panels is six times faster than traditional methods. These methods include brickwork or laying block walls. How are precast concrete wall panels fixed? This guide helps you quickly install prefabricated wall panels.

Concrete Partition Wall Panel Installation Guide
Concrete Partition Wall Panel Installation Guide

1. During stocking and transportation time it is possible to put only two stacks on top of each other. Stock yard should be level and panels should be protected against rain during stocking.

2.Panel stacks should always be lifted from under wooden pallet with a lifting fork or belt. Next, please refer to the concrete partition wall panel installation guide.


Concrete Partition Wall Panel Installation Guide

3. The Wall panel stacks can easily be moved at construction site by a forklift or a trolley.

4. Single Wall panel can easily be moved by a simple wheel.


Concrete Partition Wall Panel Installation Guide

5. wall Panels can also be moved manually by inserting short steel tube (500 mm) into the second hollow as handle. Panels should always be transported sideways.

6 .Gluing agents should be mixed carefully.


Concrete Partition Wall Panel Installation Guide

7.The line of wall is marked to the floor and ceiling before start of installation.

8.Guiding boards are fixed to the floor and ceiling. The guiding support will automatically align the wall when lifting the panels straight into upright position.


Precast concrete wall panel fixing
Precast concrete wall panel fixing

9.The gluing agent is spread on the side of the already installed Walls.

10.Before the Wall panel is lifted to upright position it should be moved so that the panel bottom is as close as possible to its correct position. After that the wall panel is lifted to upright position by two men.


Concrete Partition Wall Panel Installation Guide
Concrete Partition Wall Panel Installation Guide

11.The walls should be pushed against the previous walls (and moved up and down) so that tongue and groove are carefully positioned against each other and gluing agent is squeezing out. Correct thickness of joint between two panels is 1-2 mm.

12 Wall panel is positioned to correct level by using wooden wedges at the bottom and top of the walls. The height of wall panels should be about10 – 50 mm smaller than free room height.


This is how to install the partition wall panel correctly
This is how to install the partition wall panel correctly?

13A.The top joint is filled with polyure than foam. Correct thickness of the joint is 5 – 10 mm.

14B.Alternatively, when same gluing agent as in sides is used for top joint , wall panel is pushed against ceiling so that gluing agent is squeezing out. Correct thickness of joint is 1-2 mm.


 

Concrete Partition Wall Panel Installation Guide

14.The surplus gluing agent is removed from joints right after installation.

15.Bottom joint of wall panels is filled with mortar or concrete. Correct thickness of joint is 10 – 40 mm.


Concrete Partition Wall Panel Installation Guide

16 To the panels next to the door ‘shoulders’ are sawed or flat steel bar for door top piece fixed. The door top piece is glued by using polyurethan foam or gluing agents. Joints should be as thin as possible.

17.All corners should be strengthened with nail plugs (3/corner) for example HILTI HRD-H. We have the wall corner installation solution by T shape wall panel extruder and L shape wall panel extruder.


Concrete Partition Wall Panel Installation

18.On to corner joints paper or class fiber tape should be glued before plastering .

19.On to the joints at a door top piece paper or class fibre tape should also be glued before plastering.


Concrete Partition Wall Panel Installation

20.Flexible joints between wall panels should be built after each 5 – 6 m. PU-foam or mineral wool can be used as elastic joint material.

21.The hollow cores are used for leading through the cables and electrical boxes are drilled to any desired point.


Precast concrete wall panel fixing
Concrete Partition Wall Panel Installation

22. Wall panel needs only a very thin skim coating (1 – 2 mm) before surface finishing. It is easiest to do with a wide trowel.

23.All kinds of sawings and drilling are easy to make to the wall panels.


Concrete Partition Wall Panel Installation
Concrete Partition Wall Panel Installation

24A .installation materials and accessories Mortar, cementitious adhessive, lumber, nail plugs, wooden wedges, paper tape, PU-foam and mortar mixer.

24B Installation tools Hammer, saw, screw driver, level, meter rule, trowel, drill, trolley, concrete cutter, installation steel bar, drill for electrical boxes, buckets and lifting bars.


precast concrete wall panel fixing use Hydraulic wall panel installation machine can help you complete the wall panel construction work, saving time and effort, usually used in construction sites, fence construction, boundary wall construction and other places.

precast concrete wall panel fixing Guide

Hydraulic wall panel installation machine

Hydraulic Wall Panel Installation Machine


Double Row Hollow Precast Concrete Wall Panel Machinery

Precast Concrete Wall Panel Extruder


By reading this article, you can know how the precast concrete wall panel fixing is operated, but do you know how the precast lightweight concrete wall panel is made by the precast concrete wall panel machine? Please pay attention to our website, you will learn more about the precast concrete panel machine!

Enhance Your Concrete Production with Reliable Machinery

As a professional machinery manufacturer, Henan Kelai Industrial Co., Ltd. (Kelai Machine) provides high-performance equipment for precast concrete and building materials production.

⚙️ Multiple equipment models to meet diverse production needs
🏭 Durable industrial design built for long-term operation
🔧 Complete technical support and turnkey production solutions

📞 Contact Us | 📦 Get Equipment Solutions | 💬 Request a Quote

Contact us today

Any Questions? Need Help?

Contact KELAI Machinery Today for Professional Concrete Machinery Solutions

Click Here

Latest Articles

Main Products
Recent Post

 

 

 

 

 

 

 

Mr. Zhang – CEO of Kelai Machine

Hello and welcome! I’m Young Zhang , CEO of Henan Kelai Industrial Co., Ltd. (Kelai Machine). With 20 years of experience in precast concrete machinery manufacturing, I specialize in providing high-quality precast concrete equipment and complete production solutions. Whether you are looking for wall panel machines, hollow core slab machines, or custom precast machinery, I’m here to help you find the perfect solution. Contact me today and let’s discuss how we can optimize your precast production together.

Contact KELAI

Contact KELAI to Get Innovative Products and Competitive Prices

Contact us for relevant prefabricated machinery designs and unique insights...